#81862: "Contracts"
Tentang apa laporan ini?
Apa yang terjadi? Pilih di bawah
Apa yang terjadi? Pilih di bawah
Silakan periksa apakah sudah ada laporan tentang hal yang sama
Jika ya, silakan VOTE untuk laporan ini. Laporan dengan suara terbanyak diberikan PRIORITAS!
| # | Status | Votes | Game | Type | Title | Last update |
|---|
Detil Deskripsi
-
• Mohon salin/tempel pesan error yang Anda lihat di layar, jika ada.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Mohon jelaskan apa yang ingin Anda lakukan, apa yang kemudian Anda lakukan, dan apa yang terjadi
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Apa browser yang Anda gunakan?
Google Chrome v109
-
• Harap salin/tempel teks yang ditampilkan dalam bahasa Inggris alih-alih bahasa anda. Jika Anda memiliki screenshot bug ini (disarankan), Anda dapat menggunakan Imgur.com untuk menguploadnya dan memberi tautannya di sini.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• apakah teks ini tersedia dalam translation system? jika iya, itu bisa diartikan lebih dari 24 jam
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Apa browser yang Anda gunakan?
Google Chrome v109
-
• Tolong jelaskan saran Anda secara tepat dan ringkas sehingga semudah mungkin untuk memahami apa yang Anda maksud.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Apa browser yang Anda gunakan?
Google Chrome v109
-
• Apa yang tampil di layar ketika Anda tidak dapat berjalan (Layar kosong? Hanya tampil sebagian antar-muka? Pesan error?)
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Apa browser yang Anda gunakan?
Google Chrome v109
-
• Bagian mana dari peraturan yang tidak diterapkan dengan tepat oleh BGA
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Apakah kesalahan peraturan dapat dilihat dari ulangan permainan? Jika ya, pada langkah ke berapa?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Apa browser yang Anda gunakan?
Google Chrome v109
-
• Aksi permainan apa yang ingin Anda lakukan?
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Apa yang Anda coba lakukan untuk memunculkan aksi permainan ini?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). -
• Apa yang terjadi ketika Anda melakukannya (pesan error, pesan status permainan, ...)?
• Apa browser yang Anda gunakan?
Google Chrome v109
-
• Pada langkah ke berapa masalah tersebut muncul (apa petunjuk permainan saat itu)?
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Apa yang terjadi ketika Anda mencoba untuk melakukan aksi permainan (pesan error, pesan status permainan, ...)?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Apa browser yang Anda gunakan?
Google Chrome v109
-
• Mohon jelaskan masalah tampilannya. Jika Anda memiliki screenshot bug ini (disarankan), Anda dapat menggunakan Imgur.com untuk menguploadnya dan memberi tautannya di sini.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Apa browser yang Anda gunakan?
Google Chrome v109
-
• Harap salin/tempel teks yang ditampilkan dalam bahasa Inggris alih-alih bahasa anda. Jika Anda memiliki screenshot bug ini (disarankan), Anda dapat menggunakan Imgur.com untuk menguploadnya dan memberi tautannya di sini.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• apakah teks ini tersedia dalam translation system? jika iya, itu bisa diartikan lebih dari 24 jam
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Apa browser yang Anda gunakan?
Google Chrome v109
-
• Tolong jelaskan saran Anda secara tepat dan ringkas sehingga semudah mungkin untuk memahami apa yang Anda maksud.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Apa browser yang Anda gunakan?
Google Chrome v109
Laporkan riwayat
The elevation granted by the contract was automatically build because there was only one place available.
Contract rewards are not mandatory.
The conduit granted by the contract was automatically built.
When there isn't only one place available, there is an option to skip building the structure. It should always be an option.
Tambahkan hal lain di laporan ini
- ID meja / nomor langkah lainnya
- Apakah F5 menyelesaikan masalah?
- Apakah masalah tersebut telah muncul beberapa kali? Setiap kali? Tidak tentu?
- Jika Anda memiliki screenshot bug ini (disarankan), Anda dapat menggunakan Imgur.com untuk menguploadnya dan memberi tautannya di sini.
